Construction update
Temporary closure on Neuturmstraße
Since October 12, 2026, the road on Neuturmstraße toward Tal between Hildegardstraße and Hochbrückenstraße has unfortunately been unavailable to car and bicycle traffic until around Christmas.
Pedestrians are not affected by the closure. The sidewalk will remain accessible throughout the entire construction period.
The reason for the temporary closure is the connection of the Falckenberg Ensemble to Stadtwerke München's district cooling network. To connect SWM's pipeline to the building's service connection, the road must be opened up at specific points.
The section of Neuturmstraße toward Maximilianstraße will remain passable as a one-way street.
Vehicles can continue to approach the Mandarin Oriental Hotel from Tal along Neuturmstraße up to the area of the closure.
