03/25/2026
FALCKENBERG ENSEMBLE: Update

Structural work shortly before completion

At the beginning of 2026, construction on the FALCKENBERG ENSEMBLE progressed rapidly, and the urban renewal of the Graggenau district is becoming visible: With two new urban houses, a new lane, inviting squares, and a continuous connection from the Tal to Maximilianstraße, an urban ensemble is taking shape that integrates sensitively into the historic surroundings while simultaneously setting new standards for quality of stay: less car traffic, more space for people.

As usual, our latest film offers exciting insights:

  • Structural work is shortly before completion
  • Interior fit-out preparations are already underway, with the first window frames installed
  • West building section: final walls on the 6th floor, roof slab in preparation
  • East building section: the top-floor ceiling slab is already partially complete
  • Basement levels: fit-out and interior insulation almost complete

Over the course of 2026, the ensemble will increasingly take shape: As façade work begins, its appearance will become visible step by step, while the interior fit-out continues to progress.

Join us

Our short film on construction progress provides an informative impression of what is happening on site.